LAN Edition — Available Now

Quality Management
Intelligence
for Modern Manufacturing

InspectoQMS is the complete Quality Management System built for manufacturers of any size — whether you're pursuing ISO 9001 or AS9100D certification, or simply want a smarter, more structured quality operation.

Like having a team of Quality Engineers looking over your QMS.
Not ready for a demo? See pricing first  →
ISO 9001, AS9100D & CMMC L2
Any Size. Any Industry.
On-Premise & Secure
inspectoqms.local / dashboard
MAIN
Dashboard
QUALITY
Metrics
Non-Conformance
CAPA
First Article
PRODUCTION
Inspections
Work Orders
COMPLIANCE
Calibration
Audit
INTELLIGENCE
QME Engine
Dashboard  
Jennifer Wright  ▾
⚠ QME Alert: 1 new Critical signal detected since last engine run. View QME →
MORNING BRIEFING · MAY 25, 2026
3 NCRs overdue. 3 CAPAs past due. 3 calibration assets overdue. 5 active work orders.
Open NCRs
5
3 overdue
Open CAPAs
4
3 overdue
Cal. Overdue
3
Critical Risks
2
Quality Health Score
0 Critical
Active QME Signals
23
Browse →
ISO
ISO 9001:2015 Aligned
AS
AS9100D Aligned
CMMC
CMMC Level 2 Aligned
🔒
On-Premise Data Control
20+
Integrated QMS Modules

Built for the floor.
Built for compliance.

InspectoQMS was engineered from the ground up for manufacturers who need a real QMS — not a watered-down checklist tool or an expensive enterprise platform nobody actually uses.

🔒

Your Data Never Leaves Your Building

InspectoQMS runs entirely on your internal network. No cloud dependency, no third-party servers, no data exposure risk. Your quality records stay exactly where they belong.

🧠

Intelligent Quality Signals

The built-in QME Engine continuously analyzes your quality data — surfacing patterns across suppliers, technicians, and NCR trends before they escalate into major problems.

One Platform. Every Process.

From First Article Inspection to Management Review, InspectoQMS covers your entire quality lifecycle with 20+ integrated modules. No more patchwork of disconnected spreadsheets.

Every QMS process. Covered.

InspectoQMS includes everything a manufacturing operation needs — whether you're building a QMS from scratch, improving what you have, or working toward certification.

🔍

Inspections

Work-order-based records with step tracking, sequential numbering, and final sign-off.

⚠️

Non-Conformance (NCR)

Full NCR lifecycle: traceability, containment, disposition, SCAR, root cause, and closure.

🔧

CAPA

Corrective and Preventive Action tracking with accountability and verification workflows.

📏

Calibration

Asset calibration management with overdue alerts and automatic NCR linkage for failed instruments.

🎓

Training

Employee training compliance tracking with percentage metrics and certification records.

📄

Document Control

Controlled document library with revision management, approval workflows, and DCC.

🏭

Suppliers

Supplier performance management with SCAR generation directly from NCR workflows.

🛡️

Risk Management

Risk identification, scoring, and mitigation planning aligned with AS9100D requirements.

🔬

First Article Inspection

FAI records and approval workflows for new part introductions and process changes.

📋

Shop Travelers

Traveler documents that follow work through your shop floor from start to completion.

📊

Management Review

Structured management review with data inputs, action items, and full documentation.

✍️

Electronic Signatures

Secure, auditable e-signatures across inspection records, NCRs, and approval workflows.

☢️

HazMat

Hazardous materials tracking and management for facilities handling regulated substances.

📈

Quality Metrics

Configurable metrics dashboards with trend charts and printable management reports.

📥

Export & Reporting

Export any module to CSV, generate PDFs of individual records, download full audit bundles as ZIP, and export metrics reports directly to PowerPoint.

🔔

Notifications

In-app and email alerts keep your team on top of overdue items and new assignments.

👁️

Audit Trail

Immutable, time-stamped audit trail on every record change — always audit-ready.

🔍

FOD Prevention

Foreign Object Debris prevention program with area sweep records, item control logging, and findings management for aerospace operations.

🛡️

Product Safety

Product safety concern tracking, review workflows, and disposition records — aligned with AS9100D product safety planning requirements.

⚠️

Security Incidents

Cybersecurity incident log with breach classification, containment actions, and stakeholder notification tracking. Supports CMMC 3.6.1 / 3.6.2.

💾

Media Tracking

CUI media lifecycle management — assignment, sanitization, destruction, and chain of custody. Supports CMMC 3.8.1 / 3.8.3.

🔒

CMMC Assessment

Self-assessment across all 110 NIST SP 800-171 controls and 14 CMMC domains — with scoring, evidence tracking, and compliance package export.

View Detailed Feature Breakdown
🚨
Supplier Signal
Acme Machining — Elevated NCR Rate
NCR submissions linked to this supplier increased 42% over the last 90 days across 3 part families.
Score: 91 High Confidence
⚠️
Technician Signal
Inspector T-07 — Rework Pattern Detected
Above-average rework rate on dimensional inspections. 14 occurrences in the last 60 days.
Score: 72 Medium Confidence
Process Signal
Welding Operations — Trending Positive
NCR rate for welding declined 28% over 30 days following a targeted training intervention.
Score: 18 High Confidence

Intelligence that finds problems before you do

The Quality Management Engine (QME) is InspectoQMS's built-in analytical signal system. It continuously monitors your quality data across rolling time windows — 30, 60, 90, and 180 days — and surfaces patterns that manual review would miss.

Every signal comes with a score, a confidence level, and a plain-language summary — so your quality team spends less time digging through data and more time acting on it.

  • Supplier performance trending and anomaly detection
  • Technician rework and error pattern identification
  • NCR pattern clustering by part, process, or root cause
  • Configurable rolling windows: 30, 60, 90, 180 days
  • Signals scored and ranked by severity and confidence
See It In Action

Choose how you run it

InspectoQMS is available now as an on-premise LAN deployment. A SaaS edition is coming soon for teams who prefer a hosted solution.

🏚

LAN Edition

Runs on your internal network. Your quality data never leaves your facility. Designed for regulated manufacturers with strict data control requirements.

  • Runs on your internal server or workstation
  • No internet connection required to operate
  • Full data ownership — no third-party exposure
  • Annual software license
  • Automated local database backups
  • Multi-user with 8-tier role-based access control
Request a Demo

Ready to bring real quality intelligence
to your shop floor?

Schedule a personalized demo and see how InspectoQMS can transform your quality management process — from day one.